Built the air traffic control tower installing the cab and tower glass. One of my favorite projects.
March 2010
Great controllers, two instrument landing systems, GPS LPV approaches, and tremendous ability to clear snow off the runways, taxiways, and ramps. This is truly an all-weather airport.